Greenfield. 100% Coverage.
363 PRs Auto-Merged.
How Vectorise built Trailer Spec Pro and the SDLC that drives it. Best practice in the AI era.
Client
Trailer Spec Pro
Industry
Heavy Transport SaaS
Stack
Node.js, React, Digital Ocean
Engagement
Ongoing
Vectorise took my idea and turned it into a live, paying business in three months. I now have over ten B2B clients on the platform and we’re still shipping new features every day. Their approach is disciplined and smooth as butter. I’ll have an idea on Monday and it’s in production by EOD, tested, deployed, done.
How We Build
Three gates that every commit has to pass before it can ship.
100%
all four jest coverage gates
Coverage Enforced At The Hook
Every commit has to clear 100% coverage before it can land. A pre-commit hook enforces the four jest gates locally, and CI re-checks the same threshold as a backstop. Coverage can never regress between a developer's machine and production, and that confidence is what lets us take a feature from inception to a production release in under 15 minutes.
branches
41962/41962
functions
14415/14415
lines
109605/109605
statements
113092/113092
100% on every gate · continuously enforced
96%
of PRs authored by AI agents
AI Agents, Same Gates
96% of TSP’s pull requests were authored by autonomous AI agents running on Move Swarm, our internal mobile web app for dispatching and reviewing agent sessions from a phone over Tailscale. Every agent PR went through the same pre-commit hook, the same CI gate, and the same auto-merge job as a human one.
PRs authored by AI
00 / 100
100+
monitors across staging and prod
Staging Mirrors Prod, End To End
Staging runs as a production-fidelity environment with the same telemetry, configuration, and data shapes as the live system. Over 100 Grafana monitors, synthetic checks, and service-level objectives watch both environments, so reliability regressions surface in staging before they ever reach a customer.
100+ monitors · staging mirrors prod
The Pipeline
Six steps from prompt to production, with no human in the loop between green tests and a staging deploy.
Prompt To Production
Six steps · zero manual deploys
Prompt
remote harness
Commit
100% coverage hook
CI + auto-merge
quality gate
Staging
97s deploy
SLOs
grafana + synthetics
Production
canary + flags
Why it works
- jest unit + integration · coverage 100/100/100/100
- Playwright e2e · ephemeral environments
- Tailored agent harness · remote orchestration layer
- prompts ship to staging autonomously · one click promotes to prod
Ship Velocity
Engineering is the fastest cog in this SaaS machine. Feature requests from users are the new bottleneck.
Cumulative PRs Auto-Merged To Staging
Sep 2025 to May 2026
Each step is one PR auto-merged after green CI: 210 backend, 153 frontend, across 8 months
Want This In Your Codebase?
If you want fully agentic SDLC workflows, get in touch.
